About
Our facility is located in Ankara Province, Sincan District, Başkent OSB Atatürk Bulvarı No: 34, on a total area of 16.200 m2, in a closed area of 8.500 m2.
Since its establishment during the period over the last 34 years, our company has selected as the main activity in all regions of Turkey; took part in 156 different projects in the design, manufacturing and installation of hydromechanical equipment and permanent equipment included in the construction of dams and hydroelectric power plants, regulator structures, irrigation systems, and successfully completed its commitments in each project.
Sevinç Makina continues its design, manufacturing and assembly activities with a total of 130 personnel working within its structure.
The total installed power of the completed Hydroelectric Power Plant Projects is 2,794 MW.
The annual production capacity of our facilities is 3,500 tons / year.
Our company, which was established in 1985, is its main field of activity at home and abroad; It has completed many projects in the design, manufacturing and installation of hydromechanical equipment and permanent equipment included in the construction of dams and hydroelectric power plants, regulator structures, irrigation systems. With its expert staff, institutional, modern and dynamic structure, it has gained a safe place in the sector.
Our aim is to complete the expectations of our customers at the highest level and which is the conditions of competition; To be able to provide excellent service in every process from design to assembly in terms of cost, quality, technology and speed.
Since its establishment during the period over the last 34 years, our company has selected as the main activity in all regions of Turkey; took part in 156 different projects in the design, manufacturing and installation of hydromechanical equipment and permanent equipment included in the construction of dams and hydroelectric power plants, regulator structures, irrigation systems, and successfully completed its commitments in each project.
Sevinç Makina continues its design, manufacturing and assembly activities with a total of 130 personnel working within its structure.
The total installed power of the completed Hydroelectric Power Plant Projects is 2,794 MW.
The annual production capacity of our facilities is 3,500 tons / year.
Our company, which was established in 1985, is its main field of activity at home and abroad; It has completed many projects in the design, manufacturing and installation of hydromechanical equipment and permanent equipment included in the construction of dams and hydroelectric power plants, regulator structures, irrigation systems. With its expert staff, institutional, modern and dynamic structure, it has gained a safe place in the sector.
Our aim is to complete the expectations of our customers at the highest level and which is the conditions of competition; To be able to provide excellent service in every process from design to assembly in terms of cost, quality, technology and speed.